Data Center of Tianjin Free Trade Zone

Data Center of Tianjin Free Trade Zone

CBD Data Center Tiantan Data Center Tianjin Free Trade Zone Data Center Guomen Data Center

Tongniu Information Tianjin Free Trade Zone Data Center is located in the Tianjin Free Trade Zone Airport Area, 110 kilometers from Beijing city center, 20 kilometers from Tianjin city center, 30 kilometers from Tianjin Binhai New Area, and 5 kilometers from Tianjin Binhai International Airport. The strategic significance of the site selection is clear. The T3 + (National Class A Computer Room) standard high-level data center is designed and constructed by the Electronic Engineering Design Institute. The data center was invested and constructed by Tianjin Tongniu Information Subsidiary, which is controlled by Beijing Tongniu Information Technology Co., Ltd., and uses Tianjin Tianfang Investment Holding Co., Ltd. (one of the shareholders of Tianjin Tongniu Information) to own 1,300 acres in the Tianjin Free Trade Zone Real estate resources, equipped with two own 35KV high-voltage substations to achieve dual-channel power supply access. Tongniu Information has the entire network IDC / ISP / VPN license (Beijing, Tianjin), ISO9001, ISO27001 and other certifications, and has rich experience in data center construction and operation.

Tongniu Information Tianjin Free Trade Zone data center has four floors, with a total construction area of 15,000 square meters, a total of more than 3,000 racks, which can accommodate more than 42,000 servers, and has sufficient data room space to meet growing customer demand.

Data center main equipment

Power Systems

Shareholders own two 35KV substations

True dual / dual routing 10KV high voltage access

10KV each power supply capacity 10000KVA

Two independent power distribution rooms in the east and west are set up in the equipment room

Two 2500KVA transformers for Phase 2N

Independent two sets of low-voltage power distribution cabinets, with busbar

UPS system

UPS Eaton 2N configuration phase 1500KVA * 2

Pumps / indoor units are separately configured with UPS power supply

Battery system backup time 30 minutes

Diesel Engine System

Diesel generator N + 1 redundant configuration

10KV high voltage diesel, 1800KW / set

Submerged fuel tank for 8 hours of power supply

Air Conditioning System

Air-cooled water-cooled unit, N + 1 redundant configuration

The first phase of McQuay with a cooling capacity of 1230kW / unit

Unit integrated Freecooling module

Precision air conditioner STULZ, N + 2 redundant configuration

14 + 2 units on the second floor, cooling capacity 130kW / unit

Pipeline dual circuit water supply, circulating water 12-18 ℃

Frequency conversion Wilo pump, N + 1 redundant configuration

network system

Unicom Telecom Mobile Railcom, four-line BGP bandwidth

Independent East / West operator room, dual routing access

Interprovincial link, directly connected to Beijing data center resources

Core Cisco76 equipment, multiple exit loop redundancy

Security system

7 * 24 hours on duty, 360-degree video storage for March

Multiple access authorization system, separate / isolated area

Fire sevoflurane gas fire extinguishing system

Fire early sampling alarm system

Phase I data center layout

The first phase of the data center has 478 cabinets, which are divided into two independent computer rooms. Each channel has a separate access control area.